Go To Content
:::
Current Location Home > Main Tree > News > News
  • print
  • Go Back

【Construction News】Connection Construction of the Interchange between National Highway #1 and Taiwan Provincial Highway #74 needs to close eastbound driveway of Section 1 of Huanzhong Rd. for a long period of time to construct bridge foundation and bridge pillar structure.

【Construction News】For the Connection Construction of the Interchange between National Highway #1 and Taiwan Provincial Highway #74, there is a need to close the eastbound driveway of Section 1 of Huanzhong Rd. for a long period of time to construct the bridge foundation and bridge pillar structure. 1. Traffic control time and sections: From January 5th, 2021 to March 13th, 2023, the eastbound driveway of Section 1 of Huandong Rd. will be closed around the clock while the middle and inner lanes (from the "Fruit and Vegetable Market on Lane 215 to Dafu Rd.") will remain open during the construction. 2. Reminders: (1) During the traffic control period, two lanes will remain open and road users are requested to use detours or alternative routes to maintain a smooth traffic flow. Road users can also listen to Police Radio Station(FM94.5) to get the newest traffic conditions and to avoid wasting valuable time; (2) When passing through road sections near the construction area, do follow traffic conductors’ instructions and relevant directional guidance to slow down and to avoid traffic accidents; (3) For more road closure information, road users can call 1999(the Taichung Citizen Hotline)or 04-25575017(The 1st Construction Office of the 2nd Construction Department, the Freeway Bureau of the Ministry of Transportation and Communications(MOTC) or go to the website of the 2nd Construction Department, the Freeway Bureau of the Ministry of MOTC(https://www.freeway.gov.tw/SEO/). Alternative routes: 1. During traffic control period, alternative routes suggested: Alternative routes(heading west on eastbound):Section 1 of Huanzhong Rd.(the Intersection with Zhongqing Rd.)→Zhongqing Rd.→Houzhung North Rd.→Houzhung Rd.→Songzhu Rd.→Chungde 19th Rd.→Section 3 of Chungde Rd.→Section 1 of Huanzhong Rd.(the Intersection with Chungde Rd.). 2. Please see the attached drawing of alternative route planning. Agencies in charge and contact information: Supervisory agency: The 1st Construction Office of the 2nd Construction Department, the Freeway Bureau of the MOTC Telephone number: 04-2557-5017 Fax number: 04-2557-5081 Director Kao Mobile phone number: 0937-932081 Engineering and Construction Supervisor: Daya Supervisory and Engineering Office of T. Y. LIN INTERNATIONAL, Taiwan Telephone number: 04-2426-2365 Fax number:04-2426-2390 Director You Mobile phone number: 0935-280585 Contactor: Daya Construction Office of EARTH POWER Construction Co. Ltd. Telephone number: 04-2451-5373 Fax: 04-2451-5478 Director Tseng Mobile phone number: 0905-289300
  • Data update: 2021-11-04
  • Publish Date: 2021-08-13
  • Source: Transportation Bureau
  • Hit Count: 692