:::
Current Location
Home
> Main Tree
> News
> News
【Construction Message】The connection construction between National Highway No.1 and Taiwan Provincial Highway No. 74 requires the long-time closure of the eastbound lanes of Huandong 1st Rd. for the bridge base and the structure of the bridge building. 1. Traffic control time and sections are conducted below: Traffic control is planned to be conducted from January 5, 2021 to March 13, 2023 and the eastbound lanes of Huandong 1st Rd. including the central and inner ones will be closed 24 hours around the clock (from the "Fruit and Vegetable Market" on Lane 215 of Zhongkang St. to Dafu Rd.). During construction, two lanes will remain open. 2. Reminders: (1) Two lanes will remain open during construction and we thank you for your cooperation during traffic control. Drive slowly when passing this section and for detours during the construction, road users can use the intersection of Zhongqing Rd. or alternative routes to ensure driving safety; road users are encouraged to listen to the Police Radio Station (on FM94.5) for updated traffic conditions to avoid delays; (2) Do cooperate with traffic control and relevant instructions and drive slowly by following the instructed directions to avoid traffic accidents; (3) For more information, please call 1999 (One Call Service for Taichung Citizens) or 04-25575017 for the Construction Office 1 of the 2nd Construction Department of Freeway Bureau of the Ministry of Transportation and Communications.
【Construction Message】Long-time Closure of Eastbound Lanes of Huanzhong 1st Rd. for Additional Connection Construction of No.1 and Taiwan Provincial Highway No. 74 Interchange System
- Data update: 2021-10-21
- Publish Date: 2021-10-14
- Source: Transportation Bureau
- Hit Count: 566