:::
Current Location
Home
> Main Tree
> News
> News
News
Total 106 records,page 3of tota 4pages. records per page
- 61The Online Seminar on the MRT Network in the Tun Area of the Taichung City Government to Collect Public Opinions
- 62Mayor Lu Promotes "Slow down," "Take a Look" and "Stop" at Intersections for Road and Traffic Safety with Elementary School Students
- 63Promotion of the Taichung Shopping Festival by Bus Art around Taiwan
- 64【Construction Message】Long-time Closure of Eastbound Lanes of Huanzhong 1st Rd. for Additional Connection Construction of No.1 and Taiwan Provincial Highway No. 74 Interchange System
- 65Rolling Increase of Taichung City Bus Trips for the First Week of a New Semester
- 66Taichung MRT's First Public Artwork- "Water of Life" at Jioushe Station
- 67【Construction News】 "The C711 Fengshi Interchange Construction of National Highway #4 Taichung Loop Line Fengyuan Tazi Section" will use off peak hours in the first half of August, 2021. The eastbound or westbound driveway of Section 3 of GuoFeng Rd. will be closed (between Fengshi Rd. and Xinshan Line Railway Bridge) for the roadside construction of the main lane on Fengyuan Viaduct.
- 68【Construction News】Connection Construction of the Interchange between National Highway #1 and Taiwan Provincial Highway #74 needs to close eastbound driveway of Section 1 of Huanzhong Rd. for a long period of time to construct bridge foundation and bridge pillar structure.
- 69Sideline Bus #307 Launched to Serve New Communities in Wuqi
- 70Four New Bi-directional Bus Stops of Line#157 Since 1/25 for More Bus Transit Convenience
- 71Praises for Yellow Cab Bus Serving more than 20,000 Trips
- 72Gaining Approval of the Taichung MRT Blue Line from the Central Government; the Seminar on EIS to Listen to Local Opinions
- 73The Upgraded Transit Environment! The Newly Installed Smart Bus Stop Sign at the Taichung MRT Daqing Station
- 74Greeting the Arrival of the Taichung MRT Era with Transit Services Provided by Bus Line #53 and #800 since 4/26
- 75Good News to Local Residents in Dingliou Community, Wuqi! Loop Route Operations of Bus Line #307 to Bade Rd. and Dayong Rd. start since 4/12
- 76Review Submission of the Taichung MRT to the MOTC, Linking to the International Airport
- 77New MRT Line - Overall Taichung MRT Network Plan Approved by the MOTC
- 78Enhancement of Transit Efficacy of Triple Tracks and Public Bus - Commencement of Wuri South Bus Terminal Station
- 79Route Extension of Line #75, #85, #242 and #246 to Jixing Community in Taiping since 5/1
- 80In Response to the Development of the Commercial District around Wenxiou Parking Lot, Adjustment of the Surrounding Bus Routes from 5/10
- 81Extended Tracking for Taxi Fare in Taichung City; Maximum Fine of NT$90,000 for Violators
- 82Bus Route Extension to the Tanzi Joint Office Building since 2/26 for Better Public Convenience
- 83More than 1.27 Million Registrations for Taichung’s Free Bus Travel Scheme; Minor Adjustments of Service Time and Sites since March
- 84No Profitable Sales Allowed for the Taichung Passes "Exclusively for Taichung Citizens;" Enhanced Tracking Announced by Mayor Lu
- 85Pandemic Relief for Bus Transit Operators - Trilogy of "Relief, Stimulation and Reviving"
- 8620% off Roadside Parking Relief in Taichung
- 87A Step further towards the Official Operations of the MRT Green Line! Application for the Inspection and Approval of the Central Government by the Taichung City Government
- 88Easy Operations for Foreigners to Register Real Names via Text, the English Operating Manual for Taichung City Bus Riders now Available
- 89Joint Public Bus Stop Sign Maintenance: the Real-time Repair Report System Launched by the Taichung City Government
- 90Enhancement of Link-out Transportation in Longjing District, the Launching of Taichung City Bus #361 on 8/6
Total 106 records,page 3of tota 4pages. records per page
